Items
-
Manhole and catch basinInstallation in parking lot.
-
Second floor in 1976 buildingView of opening for the new staircase.
-
Second floor in 1976 buildingView of opening for the new reading room.
-
Second floor in 1976 buildingView is looking towards the east.
-
First floor of 1976 buildingView is looking towards the east.
-
Ground level pump roomLocated under new entry.
-
Ground floor in 1976 buildingView is looking west towards the new addition.
-
Ground floor in 1976 buildingView is looking at east wall.
-
View from Dale AveConstruction of new entry.
-
View from Dale AveExterior construction site including equipment.
-
New Addition foundationExterior construction site including equipment.
-
View from Dale AveExterior construction site including equipment.
-
Ground floor in 1976 buildingInterior stripped down and construction material stored.
-
Second floor in 1976 buildingInterior stripped down to walls and some flooring removed. Roof has been opened.
-
Second floor in 1976 buildingInterior stripped down to walls and some flooring removed.
-
View from Central GrammarConstruction of new addition foundation.
-
View from Central GrammarConstruction of new addition foundation.
-
View from Central GrammarRemoval of windows on the north side of the buidling.
-
View from Dale AveDestruction of front facade, including the front porch.
-
View from School StreetThe original structure's back wall open to the exterior.
-
Footings of New AdditionThe start of the footings in the former parking lot.
-
View from Dale AveThe interior is cleared and open to the exterior on both sides of the building.
-
View of South WingThe 1913 structure cleared of stacks and open to the exterior.
-
View from Dale AveDestruction of front facade, including the front porch.
-
Rainwater collection tankInstallation in parking lot.
-
View towards Mason StreetExcavating in the parking lot.
-
View from Mason Street cornerExterior construction site with some foundation walls
-
View from Dale AveExterior construction site with workmen and scaffolding
-
View from Dale AveExterior construction site with workmen and scaffolding
-
View from Central GrammarExterior construction site with some foundation walls, concrete mixer truck
-
View from Mason Street cornerExterior construction site with some foundation walls, concrete mixer truck
-
View from Mason Street cornerExterior construction site with shed and some foundation walls
-
View from Mason Street cornerExterior construction site with shed
-
View from Mason Street cornerExterior construction site with some foundation walls
-
View from Mason Street cornerExterior construction site with some foundation walls, machinery and workmen
-
View from Central GrammarExterior construction site with workmen and trenches for foundation walls
-
View from Mason Street cornerExterior construction site with dirt pile
-
View from Central GrammarExterior construction site with workmen and trenches for foundation walls
-
Ground floor viewFinished interior after opening - Friend Room
-
Ground floor viewFinished interior after opening - Children's Room
-
Top floor viewFinished interior after opening - Mezzanine and view of main floor
-
Main floor viewFinished interior after opening - Main circulation desk and book shelves
-
Main floor viewInterior construction site with book stacks partially filled with books
-
View from Dale Ave - Central Grammar cornerExterior construction site with final landscaping
-
Top floor viewInterior construction site with view of both top and main floor book stacks partially filled with books
-
Library Dale Ave groundsExterior construction site with final landscaping
-
Mason Street viewExterior construction site with some landscaping and workmen surveying
-
Main floor stack setupInterior construction site with finished interiors and workman building shelving frames
-
Dale Ave entranceExterior construction site with some finished landscaping
-
Overview from Central GrammarExterior construction site with some finished landscaping
-
Top floor viewInterior construction site with finished interiors, pre-furnishings
-
Top floor viewInterior construction site with finished interiors, pre-furnishings
-
Top floor viewInterior construction site with finished interiors, pre-furnishings
-
Top floor viewInterior construction site with finished interiors, pre-furnishings
-
Top floor viewInterior construction site with finished interiors, pre-furnishings
-
Top floor viewInterior construction site with finished interiors, pre-furnishings
-
Top floor viewInterior construction site with finished interiors, pre-furnishings
-
Top floor viewInterior construction site with finished interiors, pre-furnishings
-
Main floor viewInterior construction site with finished interiors, pre-furnishings
-
Main floor viewInterior construction site with finished interiors, pre-furnishings
-
Main floor viewInterior construction site with finished interiors, pre-furnishings
-
Main floor viewInterior construction site with finished interiors, pre-furnishings
-
Main floor viewInterior construction site with finished interiors, pre-furnishings
-
Main floor viewInterior construction site with finished interiors, pre-furnishings
-
Main floor viewInterior construction site with finished interiors, pre-furnishings
-
Main floor viewInterior construction site with finished interiors, pre-furnishings
-
Ground floor viewInterior construction site with finished walls and a workman building cabinets
-
Top floor viewInterior construction site with finished walls and beams without light fixtures
-
Library landscapingExterior construction site from Dale Ave with machinery shaping the grounds
-
Dale Ave fenceworkExterior construction site with two workmen fabricating fence and built-in benches
-
Ground floor viewInterior construction site with partial wall and wall studs
-
Top floor beam installationInterior construction site with concrete floor, lighting panels and scaffolding
-
Top floor viewInterior construction site with concrete floor, lighting panels and scaffolding
-
Main floor viewInterior construction site with concrete floor, electrical cable work, lighting panels and scaffolding
-
Ground floor viewInterior construction site with concrete floor, electrical cable work and wall studs
-
Top floor viewInterior construction site with concrete floor, electrical cable work and scaffolding
-
Main floor viewInterior construction site with concrete floor, electrical cable work and scaffolding
-
Exterior from Dale AveExterior construction site with workmen painting walls
-
Overview from Central GrammarExterior construction site with scaffolding and painted walls
-
Main floor viewInterior construction site with concrete floor, ventilation duct work and scaffolding
-
Ground floor viewInterior construction site with concrete floor, ventilation duct work and scaffolding
-
Second floor viewInterior construction site with concrete floor, ventilation duct work and scaffolding
-
Exterior from Central GrammarExterior construction site with scaffolding and painted walls
-
Exterior from Mason StreetExterior construction site with scaffolding and painted walls
-
Second floor viewInterior construction site with concrete floor, ventilation duct work and scaffolding
-
Top floor viewInterior construction site with concrete floor, ventilation duct work and scaffolding
-
Ground floor viewInterior construction site with concrete floor and ventilation duct work
-
Top floor --- Dale Ave sideInterior construction site with workmen and scaffolding
-
Top floor --- Mason Street sideInterior construction site with workmen and scaffolding
-
View from existing library roofExterior construction site with scaffolding and workman on roof
-
Overview from Central GrammarExterior construction site with full roof and partial walls with scaffolding
-
Top window installation from Dale Ave sideExterior construction site with workmen installing clerestory windows
-
Setting concrete --- top floorInterior construction site with workmen smoothing the concrete
-
View of new roof from old roofExterior construction site with workman laying wood sheathing
-
Overview from Central GrammarExterior construction site with building structure, partial walls/roof and scaffolding
-
Structure from main floorInterior construction site with scaffolding and workmen
-
Concrete ---- main floorExterior construction site with workmen pouring concrete from a concrete mixer truck
-
Setting concrete --- main floorExterior construction site with workmen pouring concrete over a rebar grid
-
Overview from Central GrammarExterior construction site with steel girders